– 100 bed, 135,000 sq. ft facility
– $55,000,000.00 construction cost
– Completed in 2018
– Site infrastructure upgrades: Sanitary system, electrical distribution, steam boiler plant.
– Four pipe fan coil system
– Dedicated Outdoor Air Systems with Energy Recovery
– CTa was the B3 Compliance Team Leader